<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Sunrise(Canada)Holding Co.,Ltd]]></title><description><![CDATA[Sunrise (Canada) Holding Co., Ltd. is a premier logistics provider connecting China’s industrial centers with Canada’s expanding infrastructure sector]]></description><link>https://www.sunrise-canada.ca/blog</link><generator>RSS for Node</generator><lastBuildDate>Tue, 07 Jul 2026 11:09:15 GMT</lastBuildDate><atom:link href="https://www.sunrise-canada.ca/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[Canada's Proposed West Coast Oil Pipeline: A New Chapter for Pacific Energy Exports]]></title><description><![CDATA[July 2026 The Government of Canada and the Government of Alberta have announced a proposal to advance a new West Coast crude oil pipeline, representing one of the country's most significant energy infrastructure initiatives in recent years. If developed, the project would substantially expand Canada's crude oil export capacity to the Asia-Pacific region while reshaping the country's long-term energy transportation network. Project Overview According to the announcement, the proposed pipeline...]]></description><link>https://www.sunrise-canada.ca/post/canada-announces-new-west-coast-oil-pipeline-initiative-what-it-means-for-energy-logistics</link><guid isPermaLink="false">6a49be620e6d46569499a0b0</guid><pubDate>Sun, 05 Jul 2026 02:16:02 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/ad5814_faf878b879704336b8b2ac3decb6b46d~mv2.png/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Kevin from Sunrise Canada</dc:creator></item><item><title><![CDATA[Challenges and Risk Analysis in Oversized Cargo Transportation Projects in Canada — Port Selection, Inland Transportation, and Total Logistics Cost Control for Heavy-Lift Equipment]]></title><description><![CDATA[— Port Selection, Inland Transportation, and Total Logistics Cost Control for Heavy-Lift Equipment With the continuous development of energy, mining, rail transit, chemical, and infrastructure projects in Canada, a significant amount of oversized and heavy-lift equipment must be transported from East Asia to project sites located in inland and eastern regions of Canada. Typical cargo includes: Mining equipment Pressure vessels Industrial modules Rail transit components Large generators and...]]></description><link>https://www.sunrise-canada.ca/post/challenges-and-risk-analysis-in-oversized-cargo-transportation-projects-in-canada-port-selection</link><guid isPermaLink="false">6a0b6ed6c5d6668af2e9419d</guid><pubDate>Mon, 18 May 2026 19:56:06 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/ad5814_86b053f42f1d4ee5ba3a0105759718a7~mv2.png/v1/fit/w_1000,h_581,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Kevin from Sunrise Canada</dc:creator></item><item><title><![CDATA[Canada Urban Rail Transit Project Logistics Case Study: Managing Multi‑Country Rail Supply Chains During Global Disruption]]></title><description><![CDATA[A large-scale urban rail transit project in Canada required coordinated manufacturing, transportation, assembly, and maintenance of railway rolling stock across three countries — Canada, the United States, and China. The program sourced locomotive and railcar components from dozens of manufacturers across North America, shipped components to China for assembly, and delivered completed rail vehicles back to Canada for deployment and operation. The initial lifecycle spanned ~5 years, with...]]></description><link>https://www.sunrise-canada.ca/post/canada-urban-rail-transit-project-logistics-case-study-managing-multi-country-rail-supply-chains-du</link><guid isPermaLink="false">6a08c53ddf43effc8ce032be</guid><pubDate>Sat, 16 May 2026 19:27:57 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/ad5814_5085027b78af40128058847349d0023f~mv2.jpg/v1/fit/w_670,h_815,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Kevin from Sunrise Canada</dc:creator></item><item><title><![CDATA[Zero-Damage Delivery: Moving a TBM and 900 Oversized Concrete Pipes from China to Alberta]]></title><description><![CDATA[When a municipal infrastructure project in Alberta needed a complete Tunnel Boring Machine (TBM) system and roughly 3 kilometers of oversized reinforced concrete pipe delivered from inland China to inland Canada, the logistics plan had to be engineered—not improvised. This case study shows how a containerized, multimodal approach achieved on-time delivery with zero cargo damage. Project Overview The shipment scope included: Complete TBM systems (multiple oversized, irregular components) ~900...]]></description><link>https://www.sunrise-canada.ca/post/zero-damage-delivery-moving-a-tbm-and-900-oversized-concrete-pipes-from-china-to-alberta</link><guid isPermaLink="false">6a0804730b9e4f37fd26a889</guid><pubDate>Sat, 16 May 2026 05:45:23 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/ad5814_98ba1d4918004e1c9dfc6bd77724df27~mv2.png/v1/fit/w_924,h_910,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Kevin from Sunrise Canada</dc:creator></item><item><title><![CDATA[Canada Mining Export Intermodal Container Logistics Case Study]]></title><description><![CDATA[Project Background Project Route: Manitoba, Canada → Jiangxi, China Cargo: Spodumene Concentrate, Pollucite Ore, and other mining products This project faced typical Canadian mining export challenges: inland mine locations, extremely long distance to seaports, high inland transportation costs, significant port storage expenses, fluctuating mine production volumes, and difficulty matching bulk vessel schedules with mine output. Problems with Traditional Bulk Mining Export Methods Option 1:...]]></description><link>https://www.sunrise-canada.ca/post/canada-mining-export-intermodal-container-logistics-case-study</link><guid isPermaLink="false">6a078a79e17018105dee6ab3</guid><pubDate>Fri, 15 May 2026 21:04:57 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/ad5814_68c27f321e1849019d5a2dcd37936b24~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Kevin from Sunrise Canada</dc:creator></item></channel></rss>